This 600 SF alcove studio in a post-war Co Op in the Union Square Area was ready for a spiffing up.
 
The homeowner opted for a gut renovation which included all new electrical wiring and plumbing lines behind the walls, a new subfloor and hardwood flooring installation. We enlarged two closet openings and installed all new solid core doors and hardware.
 
We also skim coated all the walls and ceiling, replaced base moldings and casings and changed the patio door!
Lighting changes include two-circuit monorail track with spots and pendants as well as wall sconces and automatic lighting at closet doors. The project continues with additional lighting, window treatments, furniture shopping and, this spring, a redesigned terrace.
 
Single click on the first photo to view in slideshow format.

 

1 - 17 of 17

Pre-Renovation Living Room
Pre-Renovation Living Room

Air Handler Cover Circa 1960
Air Handler Cover Circa 1960

Living Room Ready for Move In
Living Room Ready for Move In

Custom built air handler enclosure
Custom built air handler enclosure

Pre renovation view of the kitchen
Pre renovation view of the kitchen

The old kitchen sink
The old kitchen sink

Area outside the kitchen pre renovation
Area outside the kitchen pre renovation

View of the NEW kitchen from the living room
View of the NEW kitchen from the living room

Cabinetry outside the NEW kitchen extends use
Cabinetry outside the NEW kitchen extends use

NEW Stainless Steel appliances and granite countertop
NEW Stainless Steel appliances and granite countertop

The NEW Kitchen SInk
The NEW Kitchen SInk

 Pre Renovation bathroom tub surround
Pre Renovation bathroom tub surround

Bathroom sink and medicine cabinet Pre Renovation
Bathroom sink and medicine cabinet Pre Renovation

Bathroom flushometer Pre Renovation
Bathroom flushometer Pre Renovation

NEW tub surround
NEW tub surround

NEW sink and Medicine cabinet
NEW sink and Medicine cabinet

NEW tank toilet replaces flushometer
NEW tank toilet replaces flushometer